Today@Dal
» Go to news mainAquatron construction Thursday, November 28
Facilities Management will be carrying out essential repairs to the Aquatron bridge in the Life Sciences Centre (LSC) on Thursday, 28ÌýNovember. A contractor will be on-site to lift new equipment into the Aquatron, requiring the use of a crane near the loading bay.
This means thatÌýEdzell Castle StreetÌýbetween National Research Council (NRC) and Steele Ocean Sciences building and all sidewalks and walkways leading to it will be blocked off on Thursday from 7 a.m. to 5 p.m. The Aquatron area will also be closed.ÌýÌýÌýÌý
Please avoid parking near the Steele Ocean Sciences Building loading bay or along Edzell Castle Street before this time. Any vehicles left in the area will be towed to facilitate crane operations.
If weather prevents this work on the scheduled date, alternate arrangements will be communicated in advance.
For questions or concerns, feel free to reach out to Project Manager Avinash Emandi atÌýav417295@dal.ca
Ìý
Recent News
- Knee pain study needs participants
- Job postings
- Inventory Blowout at the Dal Bookstore
- Barbershop + Salonshop Talk
- Student Accessibility Centre to operate virtually on Monday, March 3rd
- 2024 tuition tax forms are now available through Student Accounts
- Flag lowering ‑ March 2
- Ramadan begins